Most crews order one alongside other construction site services because a job without power can't run saws, lights, or a pump, and installing a temporary power pole is one of the first calls they make. If you're planning a build in Revere, pair the pole request with your porta potty rental order early, since both usually need to be scheduled before the site opens.
What Is a Temporary Power Pole Used For?
A temporary power pole feeds a construction site before the permanent electrical service is energized. It carries a meter base, a disconnect, and outlets rated for job site loads, and a construction temporary power pole is often built to handle a 200 amp temporary power pole service on larger builds, which is why temporary power pole requirements and a temporary power pole diagram from your utility matter before anything ships. Crews use it to run light towers, saws, pumps, and heaters through framing and rough-in.
The utility company and a licensed electrician set the actual specs for your site, since amperage, panel type, and grounding depend on load and local utility rules. We don't sell electrical work. What we do is coordinate the surrounding site logistics: keeping temporary fencing clear of the pole's approach, scheduling dumpster placement so a roll-off truck isn't blocking the utility drop, and making sure sanitation units sit far enough from the pole per your site plan. A pole installed wrong is a safety hazard and a re-inspection delay, so get your electrician and the utility involved before anything else on site moves.

How Much Does Temporary Power Pole Installation Cost?
Installation cost depends on amperage, distance from the utility transformer, and how many inspections the job needs. We don't quote electrical installation pricing on this page, since that's outside our scope and varies by utility territory even within Revere. Your electrician or a licensed temporary power contractor can give you a number once they see the site.
What we can quote is everything around the pole. A standard porta potty rental runs in the range you'll see on our porta potty rental cost page, and a roll-off dumpster follows a similar day-to-month pattern:
| service | day | week | month |
|---|---|---|---|
| standard porta potty | $100-$350 | $130-$500 | $125-$325 |
| 10-20 yard dumpster | $51-$112 | $426-$778 | up to $500 |
Delivery fees for either typically run $100 to $150 for a single day, per our measured pricing data. Check dumpster permit requirements and porta potty permit requirements before your equipment lands, since placement near a temporary power pole can be restricted by clearance rules your electrician will flag.
Where Should a Temporary Power Pole Go on Site?
Placement follows the utility's access requirements first, then your site traffic flow. The pole needs a straight, unobstructed path for the utility crew's vehicle, similar to how roll-off dumpster delivery needs about 60 feet of clearance behind the truck. Keep the pole's approach separate from your porta potty placement zone and your construction dumpster staging area so nothing blocks utility access later for meter reads or upgrades.
On active job sites, OSHA 1926.404(b)(1)(ii) requires ground fault circuit interrupter protection on construction site power, which your electrician will build into the pole's panel. Keep the area lit per OSHA 1926.56(a) illumination standards, and keep debris clear of the pole footing under OSHA 1926.25 housekeeping rules. If your crew count is high, confirm toilet ratios too. OSHA 1926.51(c)(1) sets 1 toilet per 20 workers as the baseline, which matters when you're deciding how many standard units to schedule alongside the pole.
Do I need a permit for a temporary power pole in Revere?
Permit rules for temporary power vary by department and utility territory, and we haven't verified Revere's specific process, so confirm directly with the city and your utility provider before scheduling. Your electrician typically pulls this permit as part of the installation.
How long does a temporary power pole stay on site?
It usually stays until permanent service is energized and inspected, which can be weeks or months depending on the build. Coordinate removal timing with your electrician so the site isn't left without power mid-project.
Can I rent a temporary power pole directly from Revere Porta Pros?
No. We coordinate site logistics like storage containers, fencing, and restrooms, but pole installation is electrical work handled by a licensed contractor and the utility.
What amperage do most construction sites need?
It depends on load. Smaller residential jobs often run lower amperage, while larger commercial builds commonly need a 200 amp service. Your electrician calculates this from your equipment list.
Does a temporary power pole affect where I place a porta potty?
Yes. Keep restrooms clear of the utility's access path and any grounding equipment. Check our porta potty placement guide for spacing details before you finalize your site layout in Revere.

Next step
Get a delivery date
Tell us the address, the dates and the headcount. We size the order and confirm the route.